기업 소개
기업정보 상세보기
| 주력품목 | - |
|---|---|
| 주력제품 | - |
| 수출관심국가 | - |
| 수출희망제품 | - |
| 제품강점 | - |
| 보유인증 | - |
| 기업소개 | - |
제품정보
[MECHANICAL - System / Facility] Environmental Qualification Testing Equipment 상세보기• The Environmental qualification is required to provide
evidence that safety-related equipment can perform its
intended safety function(s) during and/or after specified normal,
abnormal and accident environmental conditions, e.g a Loss of
Coolant Accident(LOCA), Main Steam Line Break(MSLB) and
High Energy Line Break(HELB) of nuclear power plant.
• The Environmental qualification test condition is very
severe and this test is performed in accordance with
international codes and standards
[ENGINEERING - Other Services ] Fire Protection Safety Analysis, Design 상세보기• Comprehensive Fire Safety Assessment of Nuclear Power
Plants base on deterministic and performance-based
methodologies(Fire Hazard Analysis, Multiple Spurious
Operation Analysis, Fire Modeling, Fire Probabilistic Risk
Assessment, Fire Barrier Penetration Seals Evaluation,
External Fire Evaluation etc.)
• Comprehensive Fire Safety Assessment and Fire Protection
System Design of Building/Plant.
[ENGINEERING - Other Services ] Main Control Room Habitability Assessments (CRE In-leakage Test) 상세보기• In the event of hazardous chemical or radioactive substances
release at nuclear power plants and facilities near nuclear power
plants, hazardous chemical and other harmful gases infiltrate into
the main control room(MCR), threatening the safety of operators
working in the MCR. The In-leakage Test is performed as part of
the MCR habitability assessment to protect the MCR operator’s
health and safety under any accident condition. The In-leakage
test is to verify the integrity of the control room envelope and to
secure the habitability of the MCR operator.